How every number is made and checked · model 2026.11.14 · generated 2026-11-20

Methodology & validation

Every metric below lists its exact formula. All data is reconciled daily against the official source files; the one-off audit of 8 Oct 2026 and the latest automated check are shown here. Japanese legal and market terms are kept inline so figures can be traced to source.

Daily reconciliation

Each day one random past day per source is re-downloaded and compared with what is stored

FAIL · 13/15
last run 2026/11/20 06:02 JST
SourceDayValuesMax diffStatus
JEPX day-ahead (system + 9 areas + volume)2021-05-295280 (tol 0.01) pass
JEPX national intraday (OHLC, avg, volume, trades)2026-05-303360 (tol 0.01) pass
OCCTO imbalance prices (9 areas, shortage price)2023-01-044320 (tol 0.005) pass
TSO area output & curtailment (hokkaido)2025-08-012400 (tol 1) pass
TSO area output & curtailment (tohoku)2025-05-192400 (tol 1) pass
TSO area output & curtailment (tokyo)2025-04-012400 (tol 1) pass
TSO area output & curtailment (chubu)2024-12-202400 (tol 1) pass
TSO area output & curtailment (hokuriku)2025-04-212400 (tol 1) pass
TSO area output & curtailment (kansai)2024-10-112400 (tol 1) pass
TSO area output & curtailment (chugoku)2024-08-112400 (tol 1) pass
TSO area output & curtailment (shikoku)2024-08-032400 (tol 1) pass
TSO area output & curtailment (kyushu)2026-06-05—download failed (HTTP None, 0 bytes) error
OCCTO interconnector flows (連系線潮流実績)2026-04-2143200.05 · atc_r (tol 0.1) pass
EPRX balancing 取引結果 (2-1)2026-03-11504489.559 · chugoku:bids (tol 0.005) fail
Endpoint health (every frontend endpoint, strict JSON)—88— pass

One-off validation

One-off reconciliation of stored data against the official source files, performed 8 Oct 2026 (JST). (as of 2026-10-08)

Imbalance prices
All nine areas matched exactly every half-hour from 10 Aug 00:00 to 8 Oct 02:00 JST (2,836 per area); daily averages from 2 Sep 2025 to 7 Oct 2026 within ¥0.005. Comparison used the shortage price, which equals the surplus price in every slot of the official files. The three half-hours at the old ¥200 cap (Hokuriku 5 Dec 2025 10:30–11:30; Tokyo 22 Jul 2026 16:30) were confirmed.
TSO output & curtailment
Solar and wind matched the official files on every stored day in all nine areas, 1 Apr 2024 – 7 Oct 2026 (Chubu from 1 Mar 2024): 8,308 area-days within 1 MWh, using the confirmed monthly files, Chubu's fiscal-year ZIPs, Tohoku's daily files and the current provisional files.
JEPX day-ahead & intraday
Every value matched JEPX's files on 126 dates spread over FY2016–FY2026 — all 48 half-hours of system and nine area prices, volumes, and intraday open/high/low/close/average/volume/trades (108,864 values). The daily price history for the latest 401 days also matched.
Balancing market (EPRX)
Matched EPRX 取引結果(速報値)exactly across five products (一次, 二次①, 二次②, 三次①, 複合), Kyushu and Tokyo, every 30-minute block of 20 days (19 Sep – 8 Oct 2026) and seven fields (requested, awarded, own-area awards, bids, and max/min/average award price). Monthly averages Apr–Oct 2026 also matched; shortfall % differs only by rounding to one decimal.
Interconnector flows (OCCTO)
Matched OCCTO 連系線潮流実績 within 0.1 MW across all ten links on 25 Sep, 1 Oct and 6 Oct 2026, plus Kanmon on 3 Oct (1,488 half-hours), over nine fields (mean & max 5-minute flow, planned flow, operating capacity both directions, margins and available capacity).

Formulas

Exact definition of every metric

Curtailment outlook hit rate & adverse share
precision = curtailed ÷ flagged ; recall = flagged ÷ curtailed ; adverse share = Σ|anomaly_t|·1[direction_t matches 系統余剰/不足_t] ÷ Σ|anomaly_t|
Each TSO's 再エネ出力制御見通し (需給バランス制約) is snapshotted hourly for D+1…D+3 and every issue is kept; the newest outlook per target day is compared with the TSO's own 需給実績. Curtailment day = curtailed solar + wind energy ≥ max(10 MWh, 0.1 % of the area's solar + wind output that day) on a complete 48-slot day; curtailed energy = Σ half-hourly MW × 0.5 h, the same figure as the Renewables page. Stretches in which no outlook was captured for an area (more than three days between two issues) are marked on the hit-rate table and are not scored. Where a page is not machine-readable the board shows the history-based probability (same-month weekday/weekend curtailment-day rate blended with the last 30 days) and labels it. The adverse share of imbalance exposure is calibrated from the 算定根拠 系統余剰(1)/不足(0) flag × the area's VRE anomaly (actual − trailing-7-day same-slot mean, a proxy for the area-wide forecast) over informative half-hours (|anomaly| ≥ 10 % of expected output and ≥ 1 % of the window peak); it replaces the 70 % default in the calculator when left blank and is labelled calibrated / default / user.
Fuel drivers (implied marginal cost & pass-through)
cost_fuel = CIF ¥/unit ÷ (GJ/unit × 277.78 kWh/GJ × η) ; price_m = a + b·cost_LNG,m + c·cost_coal,m + ε_m ; LNG_CIF_m = α + β·mean(Brent × USDJPY × 6.2898)_{m−3..m−5}
CIF import prices from 財務省貿易統計 (world total, monthly 金額 ÷ 数量: 原油 ¥/kl, LNG ¥/t, 石炭 ¥/t). Heat content (HHV) and representative efficiency: LNG 54.6 GJ/t × 48 % (CCGT) → 7,280 kWh/t; coal 25.7 GJ/t × 40 % → 2,856 kWh/t; crude 38.7 GJ/kl × 39 % → 4,192 kWh/kl. Pass-through = OLS of the monthly mean area day-ahead price on the same month's LNG and coal costs (months with ≥20 trading days, since April 2016); the residual is the non-fuel component (weather, scarcity, VRE, market structure). JCC-lag model: LNG ¥/t regressed on the 3-, 4- and 5-month-lagged mean of Brent × USD/JPY (FRED DEXJPUS, DCOILBRENTEU) — the structure of Japan's crude-linked LNG contracts — so the coming months' import price is largely predetermined; the fuel-only price projection applies the pass-through to that path with a ± RMSE band. IMF Asia LNG ($/MMBtu) and Australian coal ($/t) via FRED for context; 1 t LNG ≈ 51.7 MMBtu.
Weather drivers (JMA overlay)
price_d = a + b·CDD_d + c·HDD_d + d·sun_d + e·wind_d + f·weekend_d + Σ season harmonics + ε_d ; CDD = max(T̄ − 24, 0), HDD = max(14 − T̄, 0)
One 気象官署 per area (札幌・仙台・東京・名古屋・金沢・大阪・広島・高松・福岡) from the JMA 日ごとの値 tables: daily mean/max/min temperature, sunshine hours, precipitation, mean wind, humidity; history back-filled to April 2016. OLS of the daily mean day-ahead price (and of the 11:00–14:00 midday mean) on the weather features plus seasonal terms (annual and semi-annual sine/cosine of the day of year), fitted on at least the last two years whatever window is displayed — so the weather coefficients measure departures from the time of year. The 10-year view (offered for a station once ten years of observations are held) draws weekly means, keeps the two-year fit unless the reader switches it to the whole ten years, and adds two comparison tables: each meteorological season by year, and the latest 30 or 90 days against the same calendar dates in earlier years (mean temperature and its anomaly against the complete periods, heating and cooling degree-day sums, sunshine, day-ahead / midday / evening price). Two fuel-adjusted price columns sit beside the day-ahead price: less LNG = mean of (daily area price − implied LNG fuel cost of that month, customs CIF ÷ 7,280 kWh/t), and vs fuel fit = mean of (daily area price − the price the LNG + coal pass-through fit of the fuel panel gives for that month); months customs has not published use the JCC-lag LNG projection with coal held at the latest month and are marked est. The season card compares one season with up to ten earlier years on the same dates (to the latest observation while the season is running) and needs at least three earlier years. With less than two years of observations the fit uses the displayed window without seasonal terms and only the 120-day view is offered. Forecast-day projection: JMA 7-day tmin/tmax (tavg ≈ midpoint) and a sunshine assumption from the weather code (晴 8 h, 曇 3 h, 雨・雪 0.8 h) — a weather-only sensitivity, not a price forecast; compared with the published day-ahead price once known. Out-of-sample scorecard: rolling origin over the last 365 days, the regression refitted each day on the trailing 730 days with the same features and predicting that day from its observed weather; its MAE is shown beside the MAE of a naive forecast (yesterday's price for Tuesday to Friday, the same weekday a week earlier otherwise) and their ratio. From model version 2026.11.8 the site keeps every weather forecast issue it fetches, with the time it was first seen.
Imbalance price formation (需給ひっ迫時補正)
price_t = max(調整力の限界的なkWh価格_t, 補正_t) ; 補正(x) = C (x < 3 %) ; C + (D − C)(x − 3)/5 (3 ≤ x < 8 %) ; D(10 − x)/2 (8 ≤ x < 10 %) ; 0 (x ≥ 10 %) ; C/D = 200/45 → 300/50 from 1 Oct 2026
x = the published 補正料金算定インデックス (%) of the half-hour, read with the 調整力の限界的なkWh価格 and the published 補正単価 from the monthly 算定根拠 files of the imbalance-price publication site (per half-hour and area, revisions kept). The recomputed 補正 is reconciled against the published 補正単価 for every half-hour (the rule check must stay within ¥0.01). The ¥300-regime stress recomputes the 補正 with C = ¥300 / D = ¥50 for every historical half-hour and takes max(published price, recomputed 補正) — the 調整力の限界的なkWh価格 is held, special-case half-hours (再エネ/電源Ⅲ出力抑制時単価, 電力使用制限, 計画停電, ブラックアウト) are left as published. 累積価格閾値制度 (from 1 Oct 2026): 30 half-hours with the area spot price ≥ ¥200 over the 7 days before the target day → the 補正 upper price is ¥100 from the next day until no half-hour ≥ ¥100 remains in the preceding 7 days; the stress applies it from the area's own spot history ('would have' before 1 Oct 2026). Sources: publication-site FAQ 1-6/1-7/2-2/2-11, OCCTO 調整力及び需給バランス評価等に関する委員会 第102回 資料1, 2026 public comment.
BESS stacking (arbitrage + ΔkW)
per delivery day: max Σ_t 1000·p_t·(sold_t − bought_t) + Σ_t 1000·r_t·c_t s.t. s_{t+1} = s_t + η½·bought_t − sold_t/η½ ; 2·sold_t + c_t ≤ P ; 2·bought_t + c_t ≤ P ; s_t and s_{t+1} ≥ low + (h/η½)·c_t ; low ≤ s ≤ high ; 0 ≤ c_t ≤ min(offer, MW asked for) ; Σ sold/η½ ≤ cycles/day × band ; Σ 0.5·c_t ≤ offer × hours/day
Reserve and dispatch are chosen together, half-hour by half-hour, for each delivery day that has an EPRX result, as one linear programme solved by HiGHS (2026.11.10; before, eight 3-hour blocks were picked on the window's mean price day and each MW of 三次 and 複合 reserve was backed by 3 hours of energy). c_t is the MW held for reserve in half-hour t and r_t the yen per ΔkW it earns: the average accepted price of that half-hour (the default), the highest accepted price or the cap when the half-hour was not filled (an upper bound), or a fixed bid where it would have been accepted, always settled at the cap at most. The power held is not traded in either direction. Each MW held is backed by h hours of energy through its half-hour: h = 0.5, the whole 30-minute block. EPRX asks for 30 minutes of continuous output for 二次①, 二次②, 三次① and 三次② and 5 minutes or more for 一次 (product requirements, eprx.or.jp/outline/outline.html, read 15 November 2026), and all products have been bought in 30-minute blocks since 14 March 2026. The reserve is limited to the volume the area asked for in that half-hour, to the share of power offered and to the hours a day allowed. On a reserve day the battery may start with energy in store and ends no lower than it started, so energy that backs reserve across midnight is neither lost nor gained; the arbitrage given up for reserve is measured against arbitrage alone under the same rule and is never negative. The reserve leg is measured on the days of the reserve window (30 days by default: the cap fell from 15 to 10 yen on 1 September 2026 and the primary requirement changed on 1 October 2026, so older days describe other rules), scaled to a year and added to the arbitrage of the whole price window: stacked = arbitrage of the window − arbitrage given up on the reserve days + reserve revenue on those days. Arbitrage alone is solved exactly for every delivery day of the window without a grid: the value of stored energy is a piecewise-linear function of the state of charge, built backwards through the day; round-trip efficiency is split evenly between charge and discharge; daily energy discharged ≤ cycles/day × the band (the cap's price λ is found exactly). The energy held when full follows the page's energy convention: MWh delivered ÷ √η, or MWh drawn × √η. Checks: with no reserve allowed the programme returns the exact arbitrage solver's figure (240 days, worst relative difference 7e-15); with reserve it returns the optimum of the same programme written another way and solved by SciPy (72 days, 1e-15). Stacked revenue is reported against both standalone upper bounds (arbitrage only; the offer held in every half-hour that pays) and never exceeds their sum. Not counted: activation of the reserve (kWh), penalties, intraday re-trading. Both prices of the day are known in advance; a trader does not have this, because the spot auction closes before the reserve auction. Binding constraints are counted: hours at full available power, half-hours in which a charge or discharge ends at a state-of-charge limit, days on which the cycle cap decides the schedule. Capacity fade = per-EFC rate × equivalent full cycles (+ calendar fade) when a per-EFC rate is given; the resulting SoH path replaces the flat annual degradation in the finance model.
Award odds by bid price (EPRX)
ceiling_t = cap if awarded_t < asked_t (and the product has a cap), else highest accepted price_t ; a bid b is accepted in t when min(b, cap) ≤ ceiling_t and earns min(b, cap) ; revenue per kW-year = mean over half-hours × 17,520
Award odds are read from EPRX's half-hour results for each product and area (system award results, TSO basis; all products have cleared day-ahead in 30-minute blocks, pay-as-bid, since 14 March 2026). A half-hour counts as not filled when the volume awarded, rounded to 0.1 MW, is below the volume asked for; there a small extra bid up to the cap would have been taken. Where the half-hour was filled, the highest accepted price is the most a small bid could have asked. Awards above the cap settle at the cap. The best single bid is the one fixed price, on a 0.1-yen grid, that would have earned most over the window. This is the view of a small bidder: a bid large enough to push out other accepted bids lowers the ceiling, and EPRX publishes the lowest, average and highest accepted price, not the bid list, so the effect of a large bid cannot be measured. A not-filled half-hour may also reflect bids refused for other reasons than price. The result is a record of past auctions, not a forecast. The reserve price index gives, for every product and area, the yen per kW-year of 1 kW offered in every half-hour at the average accepted price, at the ceiling and at the best single bid, over the last 30 or 90 delivery days; it counts ΔkW payments only and no energy limit, so a battery's own figure is lower (see BESS stacking).
Outside time stamps of the forecast fingerprints
token = RFC 3161 TimeStampToken over the issue's chain value (SHA-256) ; chain_d = SHA-256(chain_{d−1} | fingerprint_d), one chain per issue time (07:00 and 09:00)
Right after each forecast issue (06:45 and 08:45 JST on the day before delivery; bids close at 10:00 JST) the site sends the issue's chain value, a hash, to two independent time-stamping services (FreeTSA and Sectigo, RFC 3161) and keeps the signed tokens as received. A token proves that the chain value, and through the chain every earlier fingerprint of the same issue time (the 07:00 issues form one chain, the 09:00 issues another), existed at the token's time; anyone can check it with OpenSSL against the service's certificate, without trusting this site. Only the hash is sent: no forecast value leaves the site. /api/forecast/stamps lists the tokens and says for each whether its time is before the auction closed; /api/forecast/stamps/token returns one token. A service that is down is asked again at the next run; an issue older than three days is not stamped any more, because a late stamp proves nothing about the auction. The first tokens, for delivery date 16 November 2026, were made by hand at 16:45 JST on 15 November, after that day's auction: they prove only that those fingerprints were not changed later.
ΔkW settlement (EPRX)
settled price = min(published award price, cap in force on the delivery day) ; own-product MW = min(awarded, requested) ; composite spillover MW = max(awarded − requested, 0) ; composite line_i = composite revenue × requested_i / Σ requested
Source: EPRX notice on the ΔkW price cap (上限価格 page and its document 「需給調整市場のΔkW上限価格について」, updated 30 July 2026) — the market system does not check bids against the cap and awards above it are settled at the cap (https://www.eprx.or.jp/information/post.php). Every ΔkW revenue figure therefore uses the settled price (the balancing matrix, trend and day view show the published average beside 'settled at cap'). For 二次② and 三次① the awarded MW is split into own-product awards (≤ requested) and composite (複合) spillover, estimated as awarded − requested because the published files do not label it. A 複合商品 award is settled at the composite cap; its apportionment to 一次・二次①・二次②・三次① follows each component's requested ΔkW in the same area over the trailing window (EPRX publishes no per-component split), each line shown with the component's own cap.
Capacity market / LTDA
main: revenue_FY = kW offered × 約定価格_FY,area × adjustment_FY ; adjustment_FY = OCCTO's 調整係数 (battery: mean over 12 months of the factor for its area and whole hours of discharge) or a typed percentage ; LTDA: net = kW × contract price − return ; return = 95%·I₁ + 90%·I₂ + 85%·I₃
Main-auction 約定価格 per delivery fiscal year and area are entered from the OCCTO 約定結果 PDFs (publication date and checksum recorded; years without a published result hold the last published price and are labelled estimated). Adjustment factor (2026.11.11; before, 100 % unless the user typed a figure): when the adjustment field is left empty the finance panel applies OCCTO's 調整係数 of each delivery year, from the lists it publishes before each main auction (delivery FY2027 to FY2030; a later year holds the FY2030 list, an earlier year the FY2027 list). Battery: OCCTO prints one factor per month, area and whole hour of continuous discharge at full power from full charge (3 h to 20 h and more); a plant's expected capacity is the 12-month average of monthly factor × dischargeable power (the rule of OCCTO's 様式2 form, recomputed on the forms for FY2028, FY2029 and FY2030), so the calculator uses the average of the twelve monthly factors for the duration typed, rounded down to whole hours. A 4-hour battery in Tokyo: 64.7 % for FY2027, 68.9 % for FY2028, 70.8 % for FY2029, 73.7 % for FY2030. A battery that cannot run 3 hours at full power is not a stable source (募集要綱 第3章) and gets no revenue on this line unless a percentage is typed. Solar and wind: the annual factor of the area (Kyushu solar 6.9 %, Tokyo wind 23.2 % for FY2030). A FIT plant, and a FIP plant other than zero-premium offshore wind, cannot take part while its support period overlaps the delivery year; those years are zero. A typed percentage replaces all of this in every year. Not applied: 経過措置, penalties for missed requirements, the 1,000 kW minimum for bidding alone, and the operator's own choice to offer less than the expected capacity. LTDA (長期脱炭素電源オークション): other-market income I = arbitrage + ΔkW + other revenue − variable cost − carried loss; I₁ = income up to the capital-cost portion × kW (95 % returned), I₃ = income above (contract − area main-auction price) × kW (85 %), I₂ = between (90 %); where the two bounds overlap the 85 % tier applies from the lower bound; losses carry forward (容量確保契約約款 第28条 / 募集要綱).
Reserve margin (広域予備率)
margin_t = 広域ブロック予備力_t ÷ 広域ブロック需要_t (as published) ; hours below x% = Σ 1[margin_t < x] × 0.5
Values from the OCCTO 広域予備率Web公表システム (翌々日 = D-2, 翌日・当日 = D-1/D-0 latest). The latest values replace the stored ones; the margin as first captured and the last ten earlier versions of the margin are kept with their fetch times; 'first captured' vs 'latest' gives the D-1→final revision error. P(imbalance spike | margin band) counts same-half-hour coincidence of a shortage-price spike (≥2× day-ahead and ≥¥5 above) — coincidence, not causation. The calculator's default scarcity half-hours for the ¥300 stress = half-hours below 5 % margin in the area, scaled to a year.
Unit outages (HJKS)
MW out_d = Σ_units 1[start ≤ d ≤ restart] × (低下量 for 出力低下, 認可出力 for 停止)
Entries as published by each generator in HJKS (units ≥100 MW): planned / unplanned / output reduction with start, expected return, reason and last update. The list is diffed every 6 h: new entries, changed fields (revision history kept) and withdrawn entries. Explanation chips for a spike or split are rule-based: forced outage started that day or the day before, interconnector at ≥95 % of usable capacity, reserve margin below 8 % — 'coincides with', not causal proof.
Forward prices
realised − forward = mean(system day-ahead over the delivery period) − 先渡 average ; 間接送電権 payoff = max(DA_to − DA_from, 0) per kWh
JEPX 先渡 products (weekly / monthly / yearly, 24 h and daytime 08–18) and 間接送電権 auction results (weekly and yearly per interconnector direction) are read from the JEPX result CSVs. Subscriber settlement files (JSCC/TOCOM, EEX) are parsed into monthly ¥/kWh levels (quarters/years spread evenly), stored for that visitor only with file name, checksum and upload time, and can be turned into a saved price curve whose intraday shape comes from the area's last-365-day day-ahead history.
Capture price / rate
capture = Σ(gen_t · price_t) / Σ(gen_t) ; rate = capture / mean(price)
gen_t = the area's actual 30-minute output on each day, scaled so Σ energy = capacity × capacity-factor × hours; price_t = the area day-ahead price. Rate <80% signals cannibalisation. For a plant using the area's own profile the monthly capture price equals that month's FIP reference M.
FIP premium
R0 = A + NFC + (M − M′) ; reference = min(max(R0, 0), base′) − BC ; unit premium = base′ − reference ; month's premium = unit premium × E_p × G_total ÷ G_p
base′ = base price + 発電側課金相当額 add-on. A = previous fiscal-year average market price; M = output-weighted monthly area market price; M′ = same month of the previous fiscal year; NFC = volume-weighted price of the last four 非FIT非化石証書(再エネ指定)auctions; BC = balancing-cost allowance by delivery FY and FIP-start FY. Market price of a half-hour (第3条の5): the area's day-ahead and intraday prices weighted by their volumes. For months OCCTO has published, A, M and M′ are OCCTO's figures. For later months they are worked out from JEPX's own half-hour series of that price (FIP参照価格(卸電力取引市場分), published per area in the FIT/FIP file), weighted by the grid company's output of the source; the day-ahead area price fills any half-hour JEPX has not published (2026.11.10; before, the day-ahead price alone). Checked on Kyushu solar, April 2024 to July 2026: within 0.005 yen/kWh of OCCTO's published M in all 28 months and equal to both published A values after rounding; the day-ahead price alone was up to 0.071 away. Month's premium (第3条の3): a half-hour whose day-ahead area price is 0.01 yen pays no premium. The energy supplied in the other half-hours, E_p, is paid the unit premium × G_total ÷ G_p, where G is the grid company's published output of the same source in the area, in all half-hours of the month (G_total) and in the paid half-hours (G_p). A plant whose output follows the area's is therefore paid on its whole output, which is what the calculator showed before; the schedule now also lists the 0.01-yen half-hours of each month and the share of the plant's output in them. A co-located battery changes E_p: energy moved out of 0.01-yen half-hours earns the premium it would not have earned, energy charged in a paid half-hour gives its premium up, and the round-trip loss earns none. The calculator shows the co-located battery valued this way beside its price-only result, scheduled on each half-hour's price plus the premium a kWh supplied there earns; the month's unit premium and factor are taken as known in advance (the factor is fixed only after the month ends), so the figure is an upper estimate. Charging from the grid is not modelled. Months of the price window (2026.11.11): the monthly table, the annual FIP revenue and the average premium give every month of the window its premium and its certificates on the days it has inside the window. The twelve complete months of the schedule keep their unit premium and area factor; a month outside them (the current month to date, or the first month of a window longer than twelve complete months) is worked out with the same formula from the days stored so far and is marked as an estimate. Before, such a month carried no premium, the first month carried the certificates of its whole calendar month, and the average premium divided the schedule's twelve months by the window's energy. Legal basis: 再エネ特措法施行規則 第3条の3 (交付金の額), 第3条の4 and 第3条の5 (参照価格・単価), with the 調達価格等算定委員会 opinions.
BESS dispatch
daily rev = Σ_discharge price·e_dis − Σ_charge price·e_ch ; one charge window strictly before discharge, ≤N cycles/day
Simple rule with perfect foresight of the day's prices: one full-depth cycle, the n cheapest half-hours charge and the n dearest discharge, all charging before all discharging (two such cycles when 2 cycles/day is chosen). It is the most this rule can earn, not the optimum over all schedules: that is the constrained dispatch (BESS stacking). Energy convention: 'delivered' → e_dis = power·0.5, e_ch = e_dis/η; 'charge' → e_ch = power·0.5, e_dis = e_ch·η. A 'forecast-based capture %' scales the result to reflect imperfect dispatch. From 2026.11.10 every split point of the day is valued in one pass and only the split points that tie for the best value are worked out one by one, in the same order as before: the schedules and figures are identical (8,760 day-cases and 936 noisy-forecast cases compared), and a two-cycle run takes a few seconds.
Imbalance cost
expected cost / kWh error = adverse_share · adverse_spread + (1 − adverse_share) · favourable_spread ; error_MWh = MAE% · plant_multiplier · gen
Deviation volume = mean absolute error (not 1σ). Per slot the adverse spread is the direction that hurts (shortage − day-ahead when short, day-ahead − surplus when long) and the favourable spread the direction that helps. The default error % is the EPRX 三次② area aggregate (day-ahead→gate-closure revision), scaled by a plant-level multiplier. Imbalance unit prices use the official 不足/余剰 series (equal in every published slot).
Balancing statistics
shortfall% = (requested − awarded)/requested ; cap-hit day = any block max award ≥ cap in force that day
Prices/volumes per area × product from EPRX 取引結果(速報値). The cap in force steps 19.51 → 15 (14 Mar 2026) → 10 (1 Sep 2026) for 一次/一次オフライン/二次①/複合; 7.21 for 二次②/三次①; no cap for 三次②. Headroom is measured against the cap in force on each day.
Finance (IRR / DSCR / LCOE)
IRR solves Σ CF_t/(1+IRR)^t = 0 ; DSCR_t = CFADS_t / debt_service_t
15–20 year nominal project model: revenue schedule (FIP/merchant/PPA) net of O&M, degradation, augmentation and other costs (land lease, insurance, 発電側課金). Debt is sized by the gearing input (not a target DSCR), with a tenor and interest rate. Tax applies only when a corporate tax rate is entered: tax depreciation on the statutory tables (耐用年数省令 別表第十 200% declining balance with the 償却保証額 switch to 改定償却率, or 別表第八 straight line; both leave ¥1), 固定資産税 on a declining assessed value floored at 5% of acquisition cost (地方税法; first-year value = cost × (1 − 減価率 ÷ 2)), loss carry-forward (losses usable 10 years, oldest first, deducting up to the 50%/100% limit input — 100% for 中小法人等, 国税庁 No.5762/No.5800), and the 解体等積立金 decommissioning reserve for FIT/FIP solar ≥10 kW and FIT/FIP wind (withheld in the last 10 support years, released at decommissioning to pay the decommissioning cost which is deductible when incurred; reserve itself not deducted when withheld nor taxed when released — assumption, no 国税庁 ruling). FIT reverts to merchant revenue after the purchase period (20 yrs solar ≥10 kW and wind, 10 yrs solar <10 kW). The equity (levered) case computes tax on income after interest with the same loss rules, so the interest tax shield (= unlevered tax − levered tax) is only credited when tax is actually saved; it lifts the equity IRR and the DSCR's CFADS uses the levered tax. FIP revenue uses the dynamic 20-year projection (market escalation, BC schedule, grid add-ons). LCOE excludes corporate tax. Stand-alone battery (2026.11.11): year 1 is one row of the calculator's revenue table, chosen in the panel. Constrained dispatch (the default, the headline row): its arbitrage, its reserve revenue (held flat in nominal terms), the energy it sells and its own cost lines; simple rule with the user's forecast settings (the only basis before); or the simple rule on yesterday's schedule, which uses no forecast. The panel prints the IRR on all three. The first two know every price of the day in advance, so they are upper ends, not forecasts. The cap stress table of the constrained row settles its reserve schedule half-hour by half-hour at each cap without choosing the dispatch again.
BESS Index (day-ahead)
index = Σ_window r_d ÷ days × 365 ; r_d = max Σ_t 0.5·p_t·(discharge_t − charge_t) for a 1 kW battery, 85% round trip, one cycle, empty at midnight
The reference battery of the forecast scoring rules (1 kW of power; 1, 2, 4 or 6 hours of storage, counted as energy held: N kWh per kW, filled with N ÷ √0.85 kWh and giving N × √0.85 kWh back; efficiency split evenly between charging and discharging) is run on each area's day-ahead price. Two figures per delivery day, in yen per kW: the day's exact optimum when every price is known in advance (perfect foresight, the upper bound), and the best schedule of the day before run unchanged and settled at the day's prices (no forecast). The index is the sum over 30, 90 or 365 delivery days, divided by the days and multiplied by 365: yen per kW of power per year. No fees, network charges, levy, degradation or imbalance are deducted, and the battery is assumed not to move the price. A delivery day counts for an area when that area has all 48 half-hour prices; the nine-area average counts a day when all nine areas have a value (the JEPX file has no Hokkaido area price from 7 to 26 September 2018). Values are stored per delivery day since April 2016 and published at /api/bess-index, with monthly and fiscal-year history as CSV.
Stand-alone battery: cost lines and net revenue
net = gross − [JEPX fee + EPRX fee + generator-side kW charge + wheeling on losses + levy on losses] ; loss rate L = 1 − round-trip efficiency
JEPX fee: ¥30 per MWh on the energy bought and on the energy sold. EPRX fee: ¥0.06 per awarded ΔkW·30 min. Generator-side charge: the area's kW price × discharge kW × (1 − L) × 12. Wheeling under the special measure for storage: basic charge on charging kW × L × 12 and energy charge on charged kWh × L, at the area's extra-high voltage standard prices. Renewable levy: ¥4.18 per kWh on charged kWh × L. Prices printed with tax are divided by 1.10, so every line is before consumption tax like the market prices. Two bases are readings, shown as open points with their size: that the levy falls on the losses only (METI's stated position, not written in the Act), and the kW on which the generator-side charge is billed for a battery on the special measure. Operation and maintenance, insurance, land, an optimiser's share, auxiliary consumption and imbalance are not in these lines. The simple rule's total (on the energy that rule buys and sells) is deducted from the simple-rule and the no-forecast figures, and fills the finance panel's grid-charge field for a stand-alone battery unless a figure is typed there. The constrained figure carries the same lines on the energy its own dispatch buys and sells.
Battery on yesterday's schedule (no forecast)
r_d = Σ_discharge slots of d−1 p_d·e_dis − Σ_charge slots of d−1 p_d·e_ch ; capture = Σ r_d ÷ Σ perfect-foresight revenue of the same days
The calculator's simple dispatch rule picks its charge and discharge half-hours on the prices of the day before and is settled at the day's actual prices. It needs no forecast and uses published prices only. A day after a day with no profitable cycle earns nothing and is counted; days without a complete day before them are left out of both sums.
Price sensitivity and fleet effect
move = p(+X GW sold or bought) − p ; fleet revenue = Σ_t 0.5·p′_t·(x_t − c_t), p′_t = p_t + x_t·(p_sold,t − p_t) + c_t·(p_bought,t − p_t)
JEPX publishes, for every half-hour since FY2021, the system price it recalculates with 0.5, 1 or 5 GW more sold or bought (価格感応度). Block bids are matched again in each recalculation, so the price sometimes moves against the push; the count is shown. Fleet effect: the reference battery's best schedule on the published system price (charge c_t, discharge x_t, as shares of its power) is settled at the recalculated prices, as if a fleet of that size traded the same schedule. The schedule is not chosen again at the changed prices, and the system price says nothing about an area price when the market splits.
Bid curves
crossing: first listed price where buy ≤ sell; if sell at the row below exceeds buy at that row, the price is the row below
JEPX's bid-curve file lists cumulative sell and buy volume by price for each half-hour, for the system and for each group of two or more areas that cleared together. Read this way the crossing equalled the published system price in all 144 half-hours of 13 to 15 November 2026. Published readings: volume offered at ¥0.01 or less, volume bid at the top of the price scale, and the demand left unserved at the floor price (the least extra supply that would bring the price to the floor). The price effect of extra volume is not read off the curve: shifting it by 1 GW moved the crossing by 1.1 to 1.4 yen on those days where JEPX's recalculation moved the price by 0.7 to 1.0 yen.
Day-ahead price forecast (silent run)
forecast_D,h = mean over 728, 1,092 and 1,456 days of ridge(prices, calendar, weather) + smoothed second-stage correction (OCCTO D-2 demand, supply, reserve margin)
From model version 2026.11.8 the site fixes a forecast of the next delivery day's 48 half-hourly day-ahead prices for the nine areas and the system price, in yen/kWh. Issue: by 07:00 JST on the day before delivery from data held at 06:30, and one update by 09:00 from data held at 08:30; JEPX bids close at 10:00. An issue after its due time is marked late and a day without an issue is a missing day; both are listed in the scorecard. Storage: one record per delivery day and issue, written once and never changed. Its fingerprint is the SHA-256 of the forecast file (lines of delivery_date,issue,forecast,series,half_hour,yen_per_kwh) and is published at once at /api/forecast/fingerprints, with a chain value (the SHA-256 of the previous chain value, a bar and the fingerprint). Model ridge-wx-1: ridge regressions on prices in yen/kWh, refitted every day on the last 728, 1,092 and 1,456 days and averaged. Inputs: the prices of D−1, D−2, D−3 and D−7, the last day of the same class (working day, Saturday, Sunday or holiday), the system price of D−1, weekday and holiday flags, and the JMA weather forecast as first seen before the cut-off (maximum and minimum temperature, heating and cooling degrees, sunny or wet, at the area's station and averaged over the nine stations). The penalty is chosen by leave-one-out error. A second regression then corrects the forecast with OCCTO's two-day-ahead forecast of area demand, area supply and wide-area reserve margin by half-hour (published on the evening two days before delivery, between 17:30 and 18:45 JST in the files checked): it predicts the first regression's leave-one-out error from those numbers, on the days for which the site holds them (from April 2025). It is used once 300 such days exist and the forecast for the delivery day is held; otherwise the first regression stands alone and the record says so. Its correction is averaged over nine half-hours (a centred moving average) before it is added, because a correction that jumps between neighbouring half-hours changes their order, and with it a battery's dispatch, without lowering the error. The first regression alone is issued and scored beside the model as the first step, so the effect of the second regression is measured on the same days. Holidays are Sundays, national holidays, 2–3 January, 30 April–2 May and 30–31 December. The model is compared on every day with four simple forecasts: yesterday; last week; day type (yesterday for a working day that follows a working day, otherwise the last day of the same kind: working day after a day off, Saturday, Sunday or holiday); and a price-only regression (the same method on the four price days and the weekday alone, 728 days). Measures per area and month: mean absolute error, root mean squared error, bias in six four-hour blocks, error relative to yesterday and to last week, floor half-hours, the dearest 5% of half-hours, the daily spread, a Diebold–Mariano test, and the revenue of a reference battery dispatched on the forecast and settled at actual prices as a share of its revenue with perfect foresight (1 kW with 1, 2, 4 and 6 hours of storage, 85% round trip, one cycle a day, empty at midnight). Silent run: forecasts and scores are not shown for the first 60 delivery days; after that every day is published, missing and late days included.

Assumptions

Every assumption with its source and date

Solar capacity factor18.3% ground-mounted ≥50 kW, 14.5% rooftop調達価格等算定委員会 第113回 資料2 p.5 · FY2024–26
BESS round-trip efficiency85% (default)user input; typical Li-ion grid-scale · 2026
FIP balancing-cost allowance (BC)per 調達価格等算定委員会 schedule調達価格等算定委員会 / 施行規則 第3条の4 · FY2022–
Generation-side network charge (発電側課金)per-area kW ¥/kW·月 + kWh ¥/kWh; 2024-04-01 and 2026-11-01 steps各一般送配電事業者 託送供給等約款 · 2024-04-01 / 2026-11-01
JEPX day-ahead trading fee¥30 per MWh on each side, before taxJEPX notice of 26 November 2025 · FY2026
EPRX trading fee¥0.06 per ΔkW per 30 minutes on the awarded volume, before taxEPRX 売買手数料単価 · FY2026
Wheeling on charging (storage special measure)extra-high voltage standard service, basic ¥381.82–628.10 per kW·month and energy ¥0.78–1.24 per kWh by area, with tax, on the loss portion各一般送配電事業者 託送供給等約款; METI 2023-12-26 · 2026-11-01 (Hokuriku 2026-04-01)
Renewable-energy levy (再エネ賦課金)¥4.18 per kWh with tax; applied to charging lossesMETI 2026-03-19 · May 2026 – April 2027 meter readings
FIP reference price Moutput-weighted monthly area market price: OCCTO's figure where published, else JEPX's half-hour FIP reference price weighted by the grid company's output施行規則 第3条の5 / OCCTO reference figures / JEPX FIT・FIP file · monthly

Known limitations

  • ▸

    Fuel pass-through and weather regressions are descriptive OLS fits on monthly / daily means — they explain variance, not causality; heat rates and efficiencies are representative constants (methodology), not plant-specific; the JCC-lag LNG projection assumes the historical crude linkage and FX pass-through persist and ignores spot-LNG shares and contract renegotiation; weather is read at one station per area.

  • ▸

    The ¥300-regime imbalance stress is a counterfactual on published inputs: the 調整力の限界的なkWh価格 and the 補正料金算定インデックス are held at their historical values, so no behavioural response (more hedging, DR, intraday trading) to the higher cap is modelled; the 累積価格閾値 cap is simulated from each area's spot history.

  • ▸

    JEPX publishes intraday prices nationally only: one open, high, low, close, weighted-average price, volume and trade count per half-hour. The national average mixes areas, so its gap to the system price is not a tradable premium; area-group prices are visible to members only. This site shows the national series as published and computes no intraday-vs-day-ahead figure and no area intraday figure.

  • ▸

    Interconnector utilisation is capped at 200% in the displayed metric: it hit that cap in 12 half-hours at the Tokyo–Chubu frequency converters on 23 Sep 2026 (actual 5-minute flow exceeding planned/operating capacity during a system event); values above 200% are clipped.

  • ▸

    BESS arbitrage: both headline figures of the calculator (the simple rule and the constrained dispatch) know every price of the day in advance — real dispatch under forecast error achieves less. The forecast-error panel adds independent Gaussian noise to each half-hour's price, so it is a stylised sensitivity, not a forecast model. The no-forecast row (yesterday's schedule run unchanged) is computed from actual prices. The cost lines cover trading fees, network charges and the levy on losses only; the base of the levy and the kW on which the generator-side charge is billed for a battery are readings that the retailer and the network operator have to confirm.

  • ▸

    The BESS Index is a reference figure on day-ahead prices: it deducts no fees, network charges or degradation and assumes the battery does not move the price. The fleet effect on the Market depth page moves prices by JEPX's recalculation of the national system price and keeps the schedule fixed: it does not show area prices under market splitting, and a fleet that spreads its trades would lose less.

  • ▸

    FIP 参照価格 and premium are modelled from half-hourly area market prices, the grid company's output and the published BC/add-on schedules; they approximate but may differ from the official per-plant settlement. A plant's own output profile differs from its area's, so its share of output in 0.01-yen half-hours, and with it the premium, differs from the calculator's.

  • ▸

    The JEPX national intraday series and the imbalance analytics treat 1 October 2026 (API-only intraday) as a series break; pre/post periods are never averaged.

  • ▸

    The EGC balancing-cost website returns a CloudFront WAF challenge (HTTP 202); those fetches are skipped gracefully and do not update that feed.

  • ▸

    Request rate limits (per address and minute) are counted in each server process, so with more than one process the effective limit is higher; the admin sign-in lock-out and the question-box quota are counted in the database and apply across all processes.

Changelog

2026-11-20Model version 2026.11.14 — no figure changes: two corrections found on the day release 2026.11.13 went live. (1) The daily check of the balancing-market results. On 20 November 2026 the daily reconciliation showed a failure for EPRX results (二次①, 11 March 2026). The stored figures were right; the check was wrong. For March 2026 EPRX publishes each product's results in two files, 1 to 13 March (three-hour blocks) and 14 to 31 March (thirty-minute blocks), and each file carries rows of zeros for the other half of the month. The imports have always kept only the days a file is named for. The daily check merged the two files without that rule, so for a day from 1 to 13 March it compared the stored figures with the zeros of the second file; the difference it reported, 489.559, is exactly the largest stored figure of that day. The check now applies the same rule as the imports, through one shared function. Only days from 1 to 13 March 2026 could be affected, and only when the random pick fell on them. The second row that did not pass that day, Kyushu's area file, was a true report: the publisher's website did not answer. (2) The next-refresh time in /api/status. After a restart the first refresh often comes from the safety rule, which starts one within a minute once no process has finished a refresh for 75 minutes; the time shown was the first hourly tick, which can be later (on 20 November the page said 12:32 and the refresh ran at 12:23). The earlier of the two times is now shown.
2026-11-20Model version 2026.11.13 — no figure changes: a publisher's site that does not answer, the server's record of itself, memory, the AI key and small corrections. (1) A site that does not answer. Kyushu's transmission operator's website has given no response since about 14:00 JST on 19 November 2026. The area supply-demand file and the curtailment outlook for Kyushu come from that site, so Kyushu's area figures stop at 19 November until it answers again; the first refresh after that fills the gap, because the monthly file holds every day of the month. The fault on this side was the waiting: each of the five monthly files this site asks for was waited for 90 seconds, so every hourly refresh took about eight minutes instead of half a minute, and jobs that are meant to take turns ran at the same time. A connection now has 10 seconds to open, a download may stay silent for 60 seconds, and a site that gave no response is not asked again for two minutes, so one refresh asks a silent site once. The sources page now says "no response from the publisher's site" where it said "no monthly file available" or showed an empty error. The long grid downloads (interconnectors, balancing, transfer capacity, outages) got the same 10-second limit for opening a connection. (2) Server processes. The hosting platform asks the address /health every few seconds; it answered "not found" and now answers at once, and those requests no longer fill the access log. Between 16 and 20 November one of the two server processes was replaced five times without a publish; the platform's log showed its check waiting in vain while cached responses were rebuilt. Each process now records every 20 seconds how much memory it holds against the platform's limit, how long it could not answer a request, and what it was doing. An orderly stop is written down, so a process that was killed or crashed can be told apart, and a wait of five seconds or more is written to the log. /api/status shows these figures (vitals) and the last processes that ended. (3) Memory. Freed memory is handed back to the system after every whole rebuild of the cached responses, and blocks of 256 kB or more are taken from the system directly. On a copy of the site, resident memory after 60 rebuilds was a third lower (434 MB against 656 MB) at the same speed. The setting ALLOCATOR_TUNING=off switches this off. (4) AI texts. From 17 to 20 November the site's own key was set but the provider did not accept it; every text was written through the Universal Key after a failed first attempt (52 of 198 calls failed in the seven days to 20 November). /api/status now says which key wrote the day's texts (answered_today) and whether the own key is accepted, with a plain reason (own_key); a refused key is tried again after two hours instead of thirty minutes; quotation marks or spaces pasted around a key are no longer sent to the provider. No key and no error text is shown publicly. (5) The next-refresh time in /api/status was, after a restart, the time of a process that no longer ran; it is now shown only while the process that stamped it is alive, and otherwise the answering process's own next run. (6) Wording. The fingerprint and time-stamp notes said each chain value builds on "the previous issue". It builds on the same issue time of the delivery day before: the 07:00 issues form one chain and the 09:00 issues another. The values, the code that makes them and the forecast itself did not change. (7) The sitemap no longer gives a fixed date for pages whose figures change every hour or day. (8) The privacy notice editor now refuses to publish a text with a bracket left over from a half-deleted blank, and shows where it is; the notice published on 16 November carries one in its Japanese text.
2026-11-15Model version 2026.11.12 — no figure changes: the PDF export, the EGC notice feed, privacy and the sources page. (1) PDF export: the application now carries the Japanese font the PDF needs (IPAGothic, with its licence text beside it), so 億, 万, the area names and the FIP formula appear on every machine; on the published machine no Japanese font stood at the place the code read, and they came out as black squares. If no Japanese font can be loaded, the PDF is written in plain letters (amounts as ¥…M and ¥…k, area names in English) and says so at the top; /api/status shows which font is in use (pdf_font) and the daily checks watch it. (2) EGC notices: on the live site the daily reading of the commission's meeting pages last succeeded on 31 October 2026. The commission's site now answers a page that does not exist with HTTP 403 instead of 404; the reader took that answer for a block and showed the feed as failing. It now asks for the newest page it has already read as a control: when that page still answers, the next meeting is simply not published yet and the feed is in order; when it does not, the site is refusing the reader and the feed is reported as blocked, as before. Nothing is worked around. (3) Privacy: the analytics script that the build platform had placed in the page no longer runs for every visitor: it is out of the page, and it is loaded only if the operator switches usage statistics on and a visitor agrees in a banner, with session recording switched off (statistics are off in this release, and what the script left in a browser is removed); the three fonts are served by the site itself, so no request goes to Google's font servers; the identifier that ties saved scenarios, price curves, alerts and uploads to a browser is created only when something is saved or a question is asked, no longer on the first visit; a privacy notice in English and Japanese is prepared at /privacy and appears there, with a link in the footer, once the operator has filled in its blanks and published it (publishing with a blank left is refused). (4) Settlement uploads: the sources page now says why these prices are uploaded by their licence holder and not loaded by the site: TOCOM's settlement prices appear in JPX's free daily report, but JPX's site terms allow no reuse without permission, JSCC's file service is paid, and EEX's prices need a subscription and a further licence to be shown to others. (5) Small corrections: the imbalance CSV answers with its header row when no data is loaded for the window (it answered with an error); a build warning in the card gallery is gone.
2026-11-15Model version 2026.11.11 — four corrections to the calculator: the FIP premium of part months, the revenue the battery IRR stands on, the capacity-market adjustment factor, and the scenario workbook. Figures that change: FIP annual revenue and average premium; the stand-alone battery IRR; capacity-market revenue wherever the adjustment field is left empty. (1) FIP, months of the price window. The monthly table gave a premium only to the twelve complete months of the schedule. The current month to date had none, and in a window longer than twelve complete months the first month had none either; the first month of the window also carried the certificates of its whole calendar month. Every month of the window now carries its premium and its certificates on the days it has inside the window, by the same legal formula; a month outside the schedule is marked as an estimate. The annual FIP revenue therefore rises, most in short windows, where the current month is a large part of the days. The average premium is now the premium of the window's months divided by the window's energy. The co-located battery under FIP uses the same months. (2) Battery IRR. The finance panel took year-1 revenue from the simple rule, not from the constrained row that the page shows as its headline. The panel now has a revenue basis: constrained dispatch (the default), the simple rule with the forecast settings, or yesterday's schedule with no forecast. Each basis brings its own arbitrage, reserve revenue, traded energy and cost lines, and the panel prints the IRR on all three side by side. The cap stress table of the constrained row settles its reserve schedule at each cap, half-hour by half-hour. (3) Capacity market. The main-auction line paid the clearing price on the whole power unless the user typed an adjustment. Left empty, the adjustment is now OCCTO's published factor (調整係数) of each delivery year: for a battery by area and whole hours of discharge at full power (a 4-hour battery in Tokyo: 64.7 % for FY2027, 68.9 % for FY2028, 70.8 % for FY2029, 73.7 % for FY2030; later years hold the FY2030 list), for solar and wind by area. A battery under 3 hours cannot bid as a stable source and gets nothing on this line; a FIT or FIP plant gets nothing in the years of its support period. A typed percentage still applies to every year. New address: /api/capacity/adjustment. Sources: OCCTO's adjustment-factor lists for FY2027 to FY2030, its 様式2 form and the FY2030 募集要綱 (30 July 2026). Not changed: the LTDA line, penalties and 経過措置. (4) Scenario workbook. The Excel workbook of saved scenarios and the portfolio workbook stopped with an error when a scenario's finance inputs held a list or a table: the year schedule of the generation-side grid charge that the finance tab writes for a solar or wind plant by default, the capacity line, a state-of-health path or a forward path. The page showed "Export failed"; the PDF was not affected. Such an input is now written as text, and a table by its fields, one per row. No figure changes; this fault was found by the test run of this release.
2026-11-15Model version 2026.11.10 — award odds by bid price and a reserve price index are added; the battery calculator chooses reserve half-hour by half-hour; the FIP premium follows the rule for 0.01-yen half-hours; each forecast fingerprint gets an outside time stamp. Figures that change: the battery calculator's stacked (reserve) results in parts (2) and (3), and FIP reference estimates for months OCCTO has not published in part (5). (1) Award odds. For every balancing product, area and half-hour the Balancing page shows what a small bidder's fixed bid would have been accepted for and earned, read from EPRX's half-hour results: the share of half-hours not filled, the highest accepted price, the best single bid and the revenue per kW-year. A reserve price index on the BESS Index page gives the same per product and area for the last 30 or 90 days, with a CSV. New addresses: /api/balancing/odds, /api/balancing/reserve-index and /api/balancing/reserve-index/csv. (2) Correction: energy held for reserve. The calculator backed each MW of 三次①, 三次② and 複合 reserve with 3 hours of energy. EPRX asks for 30 minutes of continuous output for 二次 and 三次 products and 5 minutes or more for 一次, and has bought all products in 30-minute blocks since 14 March 2026. Every product is now backed by 0.5 hours of energy per MW through its half-hour, so 三次 and 複合 reserve no longer crowds out more arbitrage than it should. (3) Reserve chosen each half-hour. The stacked figure picked eight 3-hour blocks on the window's mean price day and paid them one average price at one award chance. Reserve and dispatch are now chosen together for each delivery day as one linear programme (HiGHS), half-hour by half-hour, paid the average accepted price of that half-hour (or a fixed bid where it would have been accepted, or the highest accepted price as an upper bound), limited to the volume the area asked for. The reserve leg is measured on the last 30 days of EPRX results by default, because the cap and the primary requirement changed on 1 September and 1 October 2026, and is added to the arbitrage of the whole price window. The simple rule's reserve is limited to the volume asked for as well, and its price is no longer clipped at the cap a second time. When no EPRX result lies inside the price window the constrained row is arbitrage only and says so. (4) Speed. The simple rule's search values every split point of the day in one pass; revenue figures are identical. Among half-hours of equal price the simple rule now always takes the earlier one, so the row 'yesterday's schedule' no longer depends on the processor on days with many 0.01-yen half-hours. A two-cycle run of the battery calculator took 47.5 seconds on the live service and takes a few seconds. (5) FIP. For months OCCTO has not published, A, M and M′ are worked out from JEPX's own half-hour FIP reference price (day-ahead and intraday prices weighted by their volumes) instead of the day-ahead price alone: within 0.005 yen/kWh of OCCTO's figure in all 28 months checked for Kyushu solar, against up to 0.071. The schedule lists the 0.01-yen half-hours of each month, which pay no premium (施行規則 第3条の3); the premium for the output in them is paid on the other half-hours, so a plant that follows the area's output is paid on its whole output and its premium does not change. The co-located battery is now also valued under FIP: energy it moves out of 0.01-yen half-hours earns the premium it would not have earned. For a 50 MW Kyushu solar plant with a 25 MW / 2 h battery (16 November 2025 to 15 November 2026) the uplift on prices alone is about ¥182 million a year; under FIP it is about ¥215 million at a base price of 10 yen and about ¥417 million at 36 yen. Correction to the co-located battery itself: among half-hours of equal price, which the 0.01-yen floor makes common, it now charges from the half-hour with more plant output and then the earlier one. Before, the order among equals was left to the sort routine and differed between processors, so the same request could return different figures on different servers (about 4% apart in the Kyushu example). (6) Outside time stamps. After each forecast issue the site sends the issue's chain value to two independent RFC 3161 time-stamping services and keeps the signed tokens (/api/forecast/stamps). Only a hash is sent. The forecast, its settings and its scoring are unchanged. (7) The health check reads four more addresses (86 in all), and /api/status reports the solver library and the time stamps.
2026-11-15Model version 2026.11.9 — AI texts are recorded and written by a model chosen for their purpose; four JEPX files are added; the battery calculator shows costs and a no-forecast figure; a BESS index starts. No figure published before changes, except in the battery calculator: the constrained-dispatch revenue and the IRR, both in part (5). (1) AI texts. Every AI call now passes through one module that records its purpose, the model, the kind of key, the sizes, the token counts and the outcome; neither the prompt nor the answer is stored. The daily briefing, the weekly digest and the question box use the main model. The one-line texts, the briefing card, the weekly headlines, the policy summaries and the rewrites use a lighter model. The site uses the owner's own Anthropic key when one is set and Emergent's Universal Key otherwise; when a model or a key fails before any text has arrived, the next choice is tried and the record says so. On the Universal Key the main model stays Claude Fable 5.1, the model that wrote every text before, because that key's own list of models (read 15 November 2026) has no Claude Fable 5.2; the lighter model there is Claude Haiku 5.5. With the owner's key the main model is Claude Fable 5.2. Each text names the model that wrote it. A policy notice that the model keeps leaving out of its answer is no longer sent again after three answers. (2) JEPX files. Price sensitivity (FY2021 on): the system price JEPX recalculates with 0.5, 1 or 5 GW more sold or bought. Bid curves: the latest 35 delivery days, three days fetched per hourly run. Block bids are columns of the day-ahead file the site already downloads, so they add no request. Avoidable cost and the FIP reference price (market part) come from JEPX's FIT/FIP file, one per fiscal year, read every hour for the current year because its rows arrive half-hour by half-hour (FY2022 on). All four are shown on the new Market depth page. (3) Capacity market. The three additional auctions held so far, for delivery in FY2025, FY2026 and FY2027, are listed beside the main auctions from OCCTO's result files. (4) Balancing charts. Dated events are marked with their sources: the Chubu dispatch-centre failure (delivery 6 October 2026), the EPRX market-system failure (delivery 18 October 2026), the requirement tables that apply from 1 October 2026, and the pumped-hydro contracts that lower the composite requirement. (5) Battery calculator. Both headline figures are labelled as perfect foresight. New: the same dispatch rule on yesterday's schedule, with no forecast; and each revenue figure before and after the cost lines that have a published source (JEPX and EPRX fees, generator-side kW charge, wheeling and the renewable levy on the charging losses), before consumption tax. For a stand-alone battery the finance panel's grid-charge field is now filled with that total, so the IRR it shows is lower than before unless a figure was typed there. The constrained dispatch (state-of-charge band, cycle cap, ΔkW commitment) is rebuilt: it is now each day's exact optimum, solved as a linear programme for every delivery day of the window and checked against an independent solver (HiGHS). It had three faults. First, the state of charge moved on a grid of 17 steps, so the battery could not use its full power: over the 365 days to 16 November 2026 the grid's figure for Tokyo was 3.5% below the optimum of the same problem for a 1-hour battery, 5.2% for 2 hours, 13% for 4 hours and 17% for 6 hours. Second, with some state-of-charge limits (20–90% or 15–90%, for example) the grid found no schedule and the figure was zero. Third, a window longer than 120 days was read from every n-th day and scaled up, which moved the yearly figure by up to 10% from one day to the next. The storage size now follows the page's energy convention, as the simple rule always did: with 'MWh delivered' and 85% efficiency a 2-hour battery discharges at full power for 2 hours (before, for 1.84 hours). For a 50 MW, 2-hour battery in Tokyo over those 365 days the constrained figure is ¥403.6 million; the version before showed ¥364.0 million on 15 November 2026. The constrained row is charged on the energy its own dispatch buys and sells. In the binding-constraints line the state-of-charge count is now the half-hours in which a charge or discharge ends at a limit; idle half-hours at the lower limit are no longer counted. The simple rule is no longer called an upper bound: at a full 0–100% band the exact optimum is above it. A ΔkW commitment whose energy reserve does not fit in the battery (a 3-hour product on a 1-hour battery at a high share, for example) was valued in full with no arbitrage; it is now limited to the MW whose reserve fits, and the panel says so. The simple rule's energy now counts only the days on which it trades (Tokyo had three days without a profitable 2-hour cycle in those 365), the no-forecast figure counts the day after such a day as zero instead of leaving it out, and beside a ΔkW commitment the no-forecast row and the simple rule's cost lines carry the same displaced share as the simple rule's arbitrage. (6) BESS Index (day-ahead). A reference battery (1 kW; 1, 2, 4 or 6 hours; 85% round trip; one cycle a day; empty at midnight) on each area's day-ahead price: the day's optimum with perfect foresight, and yesterday's schedule run unchanged, in yen per kW per year over 30, 90 and 365 delivery days, with monthly history and a CSV. A delivery day counts for an area when that area has all 48 prices: the JEPX file has no Hokkaido area price from 7 to 26 September 2018, so those 20 days are left out for Hokkaido and for the nine-area average. The index follows new prices three times an hour.
2026-11-14Model version 2026.11.8 — the 13:15 JST interconnector snapshot is withdrawn; weather forecast issues are kept; a day-ahead price forecast starts a silent run. No published figure changes. (1) Correction. Version 2026.11.7 added a snapshot of the OCCTO interconnector file at 13:15 JST for the next delivery date. OCCTO publishes next-day values at 17:00 JST on the day before delivery, so nothing exists at 13:15 and the snapshot never stored a value. The job, its four CSV columns (names ending _d1_1315) and its field in /api/status are withdrawn; the interconnector CSV has its 23 columns again. (2) From this version the site keeps every weather forecast issue it fetches from JMA, with the time it was first seen. Earlier issues were overwritten each hour and cannot be recovered. Two read-only addresses give the archive: /api/archive/weather/issues and /api/archive/weather/as_of. (3) Methodology wording for the OCCTO reserve margin: the latest values replace the stored ones; the margin as first captured and the last ten earlier versions of the margin are kept. (4) Silent run. Each morning the site fixes a forecast of the next delivery day's 48 half-hourly day-ahead prices for the nine areas and the system price: by 07:00 JST from data held at 06:30, with one update by 09:00 from data held at 08:30, before bids close at 10:00. The model uses past prices, the calendar, the JMA weather forecast and OCCTO's two-day-ahead forecast of demand, supply and reserve margin. A forecast is stored once and never changed. Only its SHA-256 fingerprint is public, at /api/forecast/fingerprints. The forecasts and their scores stay private for the first 60 delivery days, while they are scored against four simple forecasts under rules fixed in advance. After that every day is published, missing and late days included. No forecast and no score is shown on the site in this version.
2026-11-14Model version 2026.11.7 — one runner per scheduled job and small corrections. The only figures that change are the calculator results in part (11). (1) The service runs on more than one server process. Until now each process started the hourly refresh and the other scheduled jobs on its own, so every source was fetched once per process and all processes rebuilt their cached responses at the same moment. Each scheduled job now runs on one process per scheduled time: the hourly refresh starts at most once per 50 minutes across all processes, and at start-up one process refreshes while the others load from the database. (2) Refresh, cache rebuild and the health checks take turns across processes, and a cache rebuild pauses after each response for as long as that response took, so pages keep being served. (3) A data-version marker in the database records what was written (prices, interconnectors, briefing and so on). Every process reads it at most every 30 seconds and drops only the responses that depend on what changed; after a new day-ahead result the price-dependent responses are cleared on every process, not only on the one that imported it. The full rebuild stays once per hourly refresh, with the old responses in service until the new ones are ready. (4) If no process has completed a refresh for 75 minutes, a process runs it itself and logs why. (5) Refresh times, source status and the state of the briefing are read from the database, so every process reports the same. /api/status adds the answering process (a random id, start time, memory), the data version, and a job log kept for 7 days: per job the last start in Japan time, seconds, process, outcome, runs and seconds in the last 24 hours, and the largest number of processes that ran it for one scheduled time. (6) One more snapshot of the OCCTO interconnector file. The D-1 plan is stored at 16:50 JST, after the balancing auction. The same file is now also stored once a day at 13:15 JST for the next delivery date, after the day-ahead result and before the balancing auction clears. No page and no existing figure uses it; its values are in the interconnector CSV in four new columns ending in _d1_1315 (planned flow, usable capacity in the plan's direction, remaining capacity, link scheduled at its limit), empty for dates without the snapshot, and /api/status counts the delivery dates that have it. Corrected in 2026.11.8: this snapshot was withdrawn. (7) Question box. Its answers were not screened. They now follow the same rule and screen as the briefing, the daily card and the weekly headlines: figures and risks only, no recommendation to buy, sell, bid, hold, charge, discharge or take a position. An answer is written in full and screened before it is shown; on an advice word it is rewritten once, and if advice remains those sentences are removed and the answer ends with one fixed sentence saying that the box does not give trading advice. Question-box usage was already counted in the database, once per question for all processes. (8) Briefing after any import. The daily briefing is now also started when the hourly refresh, not only the 10:00 to 11:30 JST result poll, stores a new latest delivery date, so a result published after 11:30 JST gets its briefing within the hour. It is still one briefing per delivery date; the 12:00 JST run and the run at every start remain as fallbacks. (9) Small corrections on the pages. The Calculator page no longer scrolls sideways on a phone (360 to 430 px wide). The Forward page, the settlement upload list and the admin sign-in show times in Japan time with the JST label. The FIP 'include intraday' switch uses only the national intraday series, never a per-area intraday price: it is now shown to the administrator only, ignored in a visitor's request, off by default and labelled 'national intraday series'. (10) Admin sign-in lock-out. Failed admin sign-ins were counted in each process's memory, so each process counted separately and a restart cleared the count. They are now counted in the database with the same limits (5 failures in 15 minutes per address): the lock-out holds on every process and over a restart. Only the address and the time are stored, never a submitted key. Ordinary request rate limits are still counted per server process, as the Known limitations now say. (11) Calculator windows. In the calculators the grid-company (TSO) output window and the imbalance window counted back N calendar days from today and could include a day that was still incomplete. Both now follow the window rule of 2026.11.4: exactly the N most recent days on which that dataset holds all 48 half-hours. Days of the price window without such data carry no grid-company shape and no imbalance cost, as before. The result prints each window with its from and to dates. Effect on the default 10 MW, 365-day cases on 13 November 2026: Kyushu solar merchant revenue ¥125.18m to ¥125.12m and expected imbalance cost ¥3.49m to ¥3.51m; Tokyo solar merchant ¥236.94m to ¥236.66m; Tohoku wind merchant ¥303.09m to ¥300.32m, because two incomplete grid-company days inside the window are no longer used; Hokkaido wind revenue unchanged. Annual generation, FIT revenue and PPA revenue are unchanged in all four.
2026-11-13Model version 2026.11.6 — (1) Dates in Japan time. 'Today' is now the date in Japan (Asia/Tokyo) everywhere. The server took it from its UTC clock, so between 00:00 and 09:00 JST the site still worked on yesterday's date: windows that count back from today started a day early, the 'today' and 'tomorrow' columns of the curtailment outlook, the scarcity card, the outage panel and the weather forecast showed the previous day, and month, fiscal-year and rate-step changes arrived nine hours late. The weekly and balancing cards print their 'Generated' date in Japan time, and dates and times shown in the browser no longer depend on the reader's clock zone. Unchanged on purpose: a day's after-the-fact files (a TSO's daily actuals, OCCTO actual flows) and the daily reconciliation still wait until 09:00 JST on the following day. (2) Day-ahead result. From 10:00 to 11:30 JST the site asks JEPX for the next delivery date and imports the result when it appears, then stops for the day; before, the result waited for the hourly refresh, up to an hour. The check is made once a minute with a conditional or HEAD request, so an unchanged file is not downloaded, when JEPX answers with an ETag, Last-Modified or Content-Length. JEPX's spot file comes with none of them at present (HEAD, plain, conditional and Range requests tested on 13 November 2026), so a check needs the whole file; while that is so it is downloaded at most every 2 minutes until 10:30 JST and every 5 minutes until 11:30 JST. Only one server checks at a time, and the hourly refresh is unchanged. (3) Briefing after the result. The daily briefing is written once per delivery date when the day-ahead result has been imported (about 10:00 JST), no longer at 07:30 JST before the auction. A run at 12:00 JST and at every start writes it if it is missing, so no delivery date is skipped. A briefing written before a day-before source is published (the OCCTO D-1 interconnector plan at 16:50 JST, the 広域予備率 day-before values, the EPRX results, the TSO curtailment outlook update) names those sources in a closing 'Not yet published' section and gives no figure from them. The Briefing page and the briefing card open on the latest stored briefing and show its delivery date.
2026-11-13Model version 2026.11.5 — (1) Kansai–Chugoku congestion attribution checked against the capacity offered at D-2; the rule is unchanged because the comparison did not support extending it. Over the 90 days to 12 November 2026, 538 of the 1,324 split half-hours between Kansai and Chugoku miss the rule (remaining ATC at or below 2 % of D-1 usable capacity), all of them scheduled Chugoku → Kansai with Kansai dearer. In those 538 half-hours the capacity used after the auction (D-1 usable − remaining ATC) reached 98 % of the capacity offered at D-2 (operating capacity − margin in OCCTO's snapshot of 15:00 JST two days before delivery) in 9 (1.7 %; median 97.1 % of the offer), and D-1 usable differed from the D-2 offer in 126 (23.4 %; median −36 MW, 1.1 % of the offer). The test for extending the rule was at least 90 %, so the D-2 offer does not explain the gap: the rule and every share stay as they were (all market links 95.9 %, Kansai–Chugoku 59.4 %), and the note beside the Kansai–Chugoku share now states this comparison with its numbers, still printed as measured. (2) One window rule on the other datasets: 'N days' now means the N most recent dates that are complete in the dataset shown (all 48 half-hours), fewer only when fewer exist. It applies to the renewables / duck-curve view (the area's own TSO days), curtailment and the TSO columns of the risk scoreboard (the dates on which at least one area's TSO day is complete; an area whose file lags shows its own day count), the reserve-margin page (dates with all 48 margins published for the area, up to today), imbalance prices and the national intraday series. The outage timeline holds N calendar days ending today, because HJKS entries are daily. These windows used to start N calendar days before today, inclusive, so they held N + 1 days and included today's unfinished day. Each response states days, from and to; the pages print 'N days: from - to' and the area share card prints the dates behind its 30-day price figures. Unchanged: whole-month windows (balancing forecast error), the interconnector window, the weather and fuel panels and the calculators' windows. (3) Methodology page: a reconciliation check that has no numeric difference or tolerance (endpoint health) prints a dash instead of 'undefined (tol undefined)'.
2026-11-13Model version 2026.11.4 — congestion attribution redefined. (1) The Grid page's 'explained by congestion' counted a split half-hour only when the metered flow reached 95 % of usable capacity. JEPX splits two adjacent areas when the capacity offered to the day-ahead auction binds, so that figure understated by construction. It is replaced by 'Splits with the link scheduled at its limit': a split half-hour between two adjacent areas counts when the D-1 planned flow on the link between them is at the capacity offered to the spot market — remaining ATC at or below 2 % of usable in OCCTO's 翌日 snapshot (16:50 JST the day before delivery), the rule the congestion outlook already uses; for two areas inside the Chubu–Hokuriku–Kansai loop the fence of either area counts. Over the 90 days to 12 November 2026 the share across the nine market links is 95.9 % (38 % on the old definition, which stays on the page as 'actual flow at or above 95 %' for reference only). Kansai–Chugoku stands at 59.4 % and is printed as measured, with a note: in its other split half-hours the snapshot still showed spare capacity in the scheduled direction (median 2.9 % of usable). The daily briefing and the weekly card read the same figure; weekly cards stored earlier keep the old one, labelled as actual flow. The Guide no longer reads the remainder as a wider network split. (2) Balancing matrix: every product in which awarded MW exceeds requested MW in at least one cell now carries a visible note — awarded MW can exceed requested MW where composite (複合) awards are counted against the product; the exact EPRX field definition is being confirmed. No number changed. (3) Capacity-market table (finance panel): the OCCTO notice queue is printed beside it — the date an operator last confirmed a notice and the number of notices still unconfirmed; nothing is confirmed automatically. (4) Sources page: each source shows its own feed status — last success, last error and HTTP code. The notice feeds (METI, OCCTO, EGC, JEPX) used to share one status row, so EGC read 'feed OK' while its pages returned HTTP 403; EGC is now marked failing while its daily probe returns 403 (not bypassed). The daily health gate reports a failing regulator feed (METI, EGC, OCCTO) as a warning and does not fail on it. (5) One window rule: an 'N d' price window now holds exactly N delivery days — the N most recent delivery dates with complete day-ahead prices (48 half-hours, system price and all nine areas). Windows used to start N calendar days before today, inclusive, while prices run to D+1, so '30 d' held 32 delivery days. The overview 7-day and 30-day averages, the Volatility page, price history, the area cards' 30-day context, the calculator and BESS price windows and the price columns of the renewable risk scoreboard follow the rule through one shared helper; hour denominators equal 24 × N (the 30-day floor share is over 720 h, not 768 h). The window is printed as 'N days: from - to' beside the overview average, the Volatility heading and the scoreboard. Figures built on another dataset (TSO supply-demand, interconnector flows, intraday, balancing, imbalance) keep their own complete-day rule and take prices on their own dates.
2026-11-13Model version 2026.11.3 — withdrawn. The intraday premium over day-ahead, the per-area intraday price and spread estimates, the realisation ratios and the calculator's intraday stress (standalone and co-located BESS, with the finance and portfolio figures built on it) were withdrawn because the comparison mixed areas: it set JEPX's national intraday average against the system price or against one area's day-ahead price. Over the 120 days to 12 November 2026 the national intraday average sat ¥1.54 above the system price and ¥2.15 below the Tokyo price, so the gap is an area-mix artefact, not a premium. The Prices page now shows the national intraday series as JEPX publishes it (open, high, low, close, average, volume, trades), with the day-ahead system price and the range of the nine area prices beside it as context and no difference computed. These figures return only when area-group intraday data is available. Saved scenarios keep loading and exporting without the old stress fields; weekly cards no longer carry the intraday line, and their headlines pass the same facts-only screen as the briefing card.
2026-11-13Model version 2026.11.2 — corrections. (1) Curtailment outlook board: curtailed energy was double-counted before this version (half-hourly MW were summed without the 0.5 h factor); last-30-day energy, monthly means, hit-rate means and the area detail are now in MWh and equal the Renewables page (Kyushu last 30 days 156,007 → 78,004 MWh). (2) Curtailment day redefined: curtailed energy ≥ max(10 MWh, 0.1 % of the area's solar + wind output that day), instead of any positive amount; base rates and hit rates change accordingly. (3) Scarcity page: P(imbalance spike) by margin band now uses the selected window like the half-hour count, prints n, and shows 'n < 10' for bands with fewer than 10 half-hours. (4) Weekly card: the imbalance difference is labelled 'vs nine-area mean day-ahead'. (5) AI text: daily briefing, briefing card and policy digest state numbers and risks only — 'actionable takeaways' and 'recommended actions' removed from the prompts, every card, points section and digest screened for advice (one rewrite, then the sentence is dropped or replaced by rule-based text); older briefings are served without their takeaways section and older briefing cards show the headline only — nothing is regenerated in bulk: only the newest briefing's points and card and the current week's digest were rewritten once; the congestion-outlook hook on the Grid page follows the same numbers-only rule (hooks written under the earlier 'what to watch' prompt are not shown). (6) Policy digest: always the general edition, no portfolio read or stored; week label taken in Japan time (the Monday 08:00 JST run was labelled with the previous week). (7) Guide: 三次調整力② responds within 60 minutes (not 45); 一次, 二次①, 二次②, 三次① and 複合 moved to day-ahead 30-minute blocks on 14 March 2026 while 三次② already traded day-ahead; the 50 kW FIP rule covers ground-mounted solar and onshore wind, rooftop solar of 10 kW or more has its own scheme; loop fences apply from FY2026. (8) ΔkW settle-at-cap now cites the EPRX notice of 30 July 2026. (9) Grid page: the long-term threshold prints as 90 days (was the raw text {LONG_TERM_DAYS}); finished overnight works no longer show 'in -1 d' and a 10-hour job is no longer counted as 2 d; this page said 'EPRX area intraday' where JEPX is meant; the trough KPI shows two decimals (¥0.01 floor); floor hours on the weekly card and the Overview page are labelled as the sum of the nine areas. (10) Weather projection relabelled 'weather-only sensitivity, not a price forecast'; ± band removed; out-of-sample scorecard added (regression MAE vs a naive forecast). (11) Season card: the observation query cap follows the requested window (the newest days would have dropped out from March 2027). (12) Response cache bounded (about 400 ad-hoc entries, least recently used first out). (13) Health gate: every TSO curtailment-outlook source needs a snapshot newer than 36 hours; stretches with no captured outlook (Kyushu: none between the 20 October issue and the fix; in general more than three days between two issues) are listed under the hit-rate table and their target days are not scored. (14) Health gate and tests: outlook energy = Renewables energy, and slots = 48 × printed days.
2026-11-13Weather regression refitted on at least two years with seasonal terms (JMA history back-filled to April 2016 in the background; 365-day and 2-year views appear once two years are loaded). Kyushu curtailment outlook read from Kyuden's temporary page when the usual page carries no table (九州本土 row only; no outlook was captured between the 20 October issue and the fix). Scarcity-card hook states numbers only. BESS headline = constrained dispatch, perfect-foresight figure shown as the upper bound. Nightly job writes missing daily briefings (last 14 days). Policy digest: general edition without a portfolio; source-quality remarks go to the operator log.
2026-10-13Decision-grade revenue stack, phase 2 (2): TSO curtailment outlooks — nine 再エネ出力制御見通し pages (HTML / CSV / Tohoku GIF) snapshotted hourly with every issue kept, nine-area board for D+1…D+3 with history-based probability where a page is not readable, hit-rate history against the TSO 需給実績 (precision / recall / false alarm per horizon and area), per-area snapshot history and base rates, alert rule curtailment_outlook, briefing context; adverse share of imbalance exposure calibrated from the 算定根拠 系統余剰/不足 direction × area VRE anomaly (calculator blank = calibrated, labelled).
2026-10-13Decision-grade revenue stack, phase 2 (3): fuel & FX drivers (財務省貿易統計 CIF crude/LNG/coal, FRED USD/JPY & Brent, IMF Asia LNG & Australian coal; implied marginal costs, monthly pass-through regression, JCC-lag LNG projection) and JMA weather overlays (nine 気象官署 daily observations, 7-day forecast, CDD/HDD/sunshine regression, forecast-day price projection); new /drivers page; briefing context.
2026-10-13Decision-grade revenue stack, phase 2 (1): imbalance price formation rules — monthly 算定根拠 feed (補正料金算定インデックス, 調整力の限界的なkWh価格, 需給ひっ迫時補正単価, インバランス量, 系統余剰/不足, 分断エリア区分, special-case flags, from Apr 2022), rule reconciliation, rule-based ¥300/¥50 counterfactual replacing the cap rescale in the calculator and imbalance panel, 累積価格閾値 tracker, index vs OCCTO 広域予備率 comparison, briefing context.
2026-10-11Decision-grade revenue stack, phase 1: BESS stacking co-optimisation (SoC band, power, cycle cap, energy reserve; bounds and binding constraints; per-EFC fade path), ΔkW settle-at-cap and composite split, capacity market & LTDA module (OCCTO auction tables with checksums, 95/90/85 % return tiers), sources-and-terms registry with live status and export notice, OCCTO 広域予備率 feed (revisions kept; scarcity default; alerts), HJKS unit outages (revision history; explanation chips), JEPX 先渡 and 間接送電権, settlement upload → price path, area-group intraday import hook.
2026-10-09Tax model refinements: loss carry-forward (10-year, 50%/100% limit), interest shield only when tax is saved (levered tax), FIT reverts to merchant after the purchase period, decommissioning cost + reserve scope (solar ≥10 kW and wind), statutory depreciation tables (別表第十/第八), fixed-asset-tax 5% floor.
2026-10-09Project-finance tax, cost and reserve inputs (corporate tax, depreciation, 固定資産税, 解体等積立金, land/insurance/発電側課金); interest tax shield at the levered level; BESS forecast-error dispatch panel; OCCTO FY2024–FY2026 reference figures imported.
2026-10-08Methodology & validation page, daily reconciliation job, published one-off audit results, calculator audit trail + CSV export.
2026-10-08Revenue models: capture price from actual per-day output, BESS energy convention + network charge, imbalance MAE + plant multiplier, per-area 発電側課金 table.
2026-10-08Balancing cap step-table in the area matrix, per-area 発電側課金 for repowering, fast history endpoints, long price history to 2016, provisional/partial-day flags, coverage for all datasets, imbalance backfill to 2022-04.
2026-10-08Legal FIP premium formula, OCCTO reference CSV upload, 20-year FIP projection, FIP balancing-cost double-count fix.
2026-10-08Historical backfills: JEPX day-ahead & intraday from FY2016, TSO actuals, Chubu ZIP archives, Tohoku daily files.

Data sources & coverage

First date, last date, missing days and last fetch per feed

DatasetFirstLastMissingLast fetch
JEPX day-ahead (spot_summary)2016-04-012026-11-2102026/11/20 17:52 JST
JEPX intraday (intraday)2016-04-012026-11-2002026/11/20 17:52 JST
Imbalance prices2022-04-012026-11-2002026/11/20 17:52 JST
EPRX balancing · 一次調整力 (1-0)2025-04-012026-11-2102026/11/20 17:53 JST
EPRX balancing · 一次オフライン (1-1)2025-04-012026-11-2102026/11/20 17:53 JST
EPRX balancing · 二次調整力① (2-1)2025-04-012026-11-2102026/11/20 17:53 JST
EPRX balancing · 二次調整力② (2-2)2025-04-012026-11-2102026/11/20 17:53 JST
EPRX balancing · 三次調整力① (3-1)2025-04-012026-11-2102026/11/20 17:53 JST
EPRX balancing · 三次調整力② (3-2)2025-04-012026-11-2102026/11/20 17:53 JST
EPRX balancing · 複合商品 (4-0)2025-04-012026-11-2102026/11/20 17:53 JST
Interconnector flows (連系線潮流実績)2026-03-302026-11-1902026/11/20 17:52 JST
Forward ATC (連系線空容量)2026-03-302026-11-2202026/11/20 17:53 JST
Non-fossil certificate auctions (非化石証書)2018-08-102026-08-31—2026/11/20 17:52 JST
OCCTO FIP reference prices (基準価格 参照値)2024-042026-07——
OCCTO 広域予備率 — D-1/D-0 latest2025-04-012026-11-2102026/11/20 17:54 JST
OCCTO 広域予備率 — D-22025-04-012026-11-2202026/11/20 17:54 JST
OCCTO 広域予備率 — weekly2025-04-012026-11-2702026/11/20 17:54 JST
Imbalance calculation basis (算定根拠: index, marginal kWh price, 補正)2022-04-012026-11-2002026/11/20 17:52 JST
Fuel import prices (貿易統計 crude / LNG / coal, monthly)1988-012026-09—2026/11/20 15:54 JST
FX & oil (FRED USD/JPY, Brent, daily)2015-01-022026-11-17—2026/11/20 17:54 JST
Weather observations (JMA, 9 stations, daily)2016-04-012026-11-1902026/11/20 12:52 JST
HJKS unit outages (≥100 MW)2001-04-012026-11-20—2026/11/20 18:00 JST
TSO curtailment outlooks (出力制御見通し, 9 areas, snapshots)2026-10-132026-11-23—2026/11/20 18:01 JST
JEPX 先渡 (forward) traded products—2024-09-14—2026/11/20 17:40 JST
JEPX 間接送電権 auctions—2026-10-22—2026/11/20 17:40 JST
TSO area supply-demand (エリア需給実績) · hokkaido2024-04-012026-11-1502026/11/20 17:52 JST
TSO area supply-demand (エリア需給実績) · tohoku2024-04-012026-11-2002026/11/20 12:49 JST
TSO area supply-demand (エリア需給実績) · tokyo2024-04-012026-11-2002026/11/20 17:52 JST
TSO area supply-demand (エリア需給実績) · chubu2024-03-012026-11-2002026/11/20 17:52 JST
TSO area supply-demand (エリア需給実績) · hokuriku2024-04-012026-11-2002026/11/20 17:52 JST
TSO area supply-demand (エリア需給実績) · kansai2024-04-012026-11-2002026/11/20 17:52 JST
TSO area supply-demand (エリア需給実績) · chugoku2024-04-012026-11-2002026/11/20 17:52 JST
TSO area supply-demand (エリア需給実績) · shikoku2024-04-012026-11-2002026/11/20 17:52 JST
TSO area supply-demand (エリア需給実績) · kyushu2024-04-012026-11-2002026/11/20 17:52 JST
Sources: JEPX spot, intraday, 先渡 & 間接送電権 CSV · TSO area supply-demand actuals (エリア需給実績) · OCCTO imbalance, interconnector, 広域予備率 & capacity-market data · HJKS outages · EPRX · METI · EGC — attribution & terms · privacy notice · Japan's new intraday market (Oct 2026) · Prices in ¥/kWh · For information only, not investment advice.